ECIG Head Office


2022

Dubai

Solar

Located on the busy Al Ittihad road, with a view of the runways of Dubai International Airport, the ECIG corporate office has employee health and wellbeing as the focal point of its design, construction and operations. TTE proposed the installation of a 300kW and 13.48 kWp solar system on the premises and 70 solar powered glass Photo Voltaic (PV) panels of varying wattage. Currently under construction, the system is estimated to result in an annual energy avoidance of 480 MWh, an annual cost avoidance of 206,000 AED and an estimated annual carbon reduction of 340,000 kgs. of carbon di-oxide.

See similar projects


Al Gurg Building Services

Scientechnic Warehouse

Mercedes Benz Showroom

View all

You may also be interested in