2022
Dubai
Construction
TTE’s successfully completed the EPC Contract for a 1403 sq. mtrs semi-permanent EMPOWER District Cooling System in Dubai in a record time of 120 days. This included all related activities from the design and construction of the foundation for a water-cooled chiller with a capacity of 1220 TR, to the makeup and blowdown water tanks foundation, the DEWA equipment foundation, the private transformer foundation, and the RMU foundation. In addition, the supply and installation of precast boundary walls for the entire plot was also done.
TTE undertook all the MEP-related work as well, which includes the installation of a water-cooled chiller, the supply, installation, testing, and commissioning of chilled water pipe, CCTV systems, and firefighting systems.