EMPOWER District Cooling System


2022

Dubai

Construction

Empower

TTE’s successfully completed the EPC Contract for a 1403 sq. mtrs semi-permanent EMPOWER District Cooling System in Dubai in a record time of 120 days. This included all related activities from the design and construction of the foundation for a water-cooled chiller with a capacity of 1220 TR, to the makeup and blowdown water tanks foundation, the DEWA equipment foundation, the private transformer foundation, and the RMU foundation. In addition, the supply and installation of precast boundary walls for the entire plot was also done.

TTE undertook all the MEP-related work as well, which includes the installation of a water-cooled chiller, the supply, installation, testing, and commissioning of chilled water pipe, CCTV systems, and firefighting systems.

See similar projects


ACT Greenfield liquid terminal
Greenfield Liquid Terminal

port de la mer
Port De La Mer

Address Hotel, Downtown Dubai
Address Downtown Hotel

Wild Wadi

Al Gurg Building Services

Peru Pavilion

View all

You may also be interested in